Gas Line Installation Cost in Brookings, SD
LOW
AVERAGE
HIGH
What is the cost to Install Gas Lines in Brookings, SD?
Knowing the gas line installation in Brookings costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Brookings permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total gas line installation Brookings costs have been $369.20 to $427.52.
To breakdown that number by line the averages are $369.20 to $427.52 per line. This number includes the following:
- Average labor costs per hour in Brookings which are typical of gas line installation projects.
- Materials and equipment costs necessary to install gas lines in Brookings, SD, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Brookings permits required for gas line installation projects, which may also include inspection and building fees. Please contact Brookings city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Brookings, 57006 area.
- Supply and material county and state sales taxes in Brookings county, South Dakota.
- Brookings general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Brookings gas line installation projects.
Gas Line Installation Brookings Projects - Cost Breakdown:
- $202.88 to $221.24 - typical hourly labor costs seen for gas line installation Brookings projects in 2014.
- $138.72 to $150.22 - typical costs associated with Brookings gas line installation projects in 2014. This figure may include mounting hardware, fittings and connectors, as required.
- $27.60 to $56.06 - pipe cutting and threading, brazing kit, tubing cutter and pipe wrenches costs, as well as any other necessary equipment and machinery.