Home Painting Cost in Lorain, OH
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Paint Homes in Lorain, OH?
Knowing the home painting in Lorain costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Lorain permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total home painting Lorain costs have been $666.59 to $1,161.64.
To breakdown that number by square foot the averages are $3.34 to $5.81 per square foot. This number includes the following:
- Average labor costs per hour in Lorain which are typical of home painting projects.
- Materials and equipment costs necessary to paint homes in Lorain, OH, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Lorain permits required for home painting projects, which may also include inspection and building fees. Please contact Lorain city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Lorain, 44052 area.
- Supply and material county and state sales taxes in Lorain county, Ohio.
- Lorain general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Lorain home painting projects.
Home Painting Lorain Projects - Cost Breakdown:
- $445.46 to $912.40 - typical hourly labor costs seen for home painting Lorain projects in 2014.
- $162.47 to $175.93 - typical costs associated with Lorain home painting projects in 2014. This figure may include solvents, masking tape and paper, cleanup supplies and surface repair material, as required.
- $58.65 to $73.31 - 10+ amp electric paint sprayer, 3000 psi and 115v costs, as well as any other necessary equipment and machinery.