Wood Flooring Installation Cost in Orlando, FL
LOW
AVERAGE
HIGH
What is the cost to Repair Wood Flooring in Orlando, FL?
Knowing the wood flooring installation in Orlando costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Orlando permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total wood flooring installation Orlando costs have been $273.36 to $302.86.
To breakdown that number by repair the averages are $273.36 to $302.86 per repair. This number includes the following:
- Average labor costs per hour in Orlando which are typical of wood flooring installation projects.
- Materials and equipment costs necessary to repair wood flooring in Orlando, FL, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Orlando permits required for wood flooring installation projects, which may also include inspection and building fees. Please contact Orlando city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Orlando, 32801 area.
- Supply and material county and state sales taxes in Orange county, Florida.
- Orlando general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Orlando wood flooring installation projects.
Wood Flooring Installation Orlando Projects - Cost Breakdown:
- $188.54 to $196.85 - typical hourly labor costs seen for wood flooring installation Orlando projects in 2014.
- $27.03 to $29.27 - typical costs associated with Orlando wood flooring installation projects in 2014. This figure may include fasteners, surface sealants, manufacturer recommended underlayment, fasteners and adhesives, as required.
- $57.79 to $76.76 - 3 1/4" electric planer, 3" belt sander, pneumatic finish nailer, 10" miter saw and electric jigsaw costs, as well as any other necessary equipment and machinery.