Wood Flooring Installation Cost in Bend, OR
LOW
AVERAGE
HIGH
What is the cost to Repair Wood Flooring in Bend, OR?
Knowing the wood flooring installation in Bend costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Bend permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total wood flooring installation Bend costs have been $297.74 to $328.33.
To breakdown that number by repair the averages are $297.74 to $328.33 per repair. This number includes the following:
- Average labor costs per hour in Bend which are typical of wood flooring installation projects.
- Materials and equipment costs necessary to repair wood flooring in Bend, OR, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Bend permits required for wood flooring installation projects, which may also include inspection and building fees. Please contact Bend city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Bend, 97701 area.
- Supply and material county and state sales taxes in Deschutes county, Oregon.
- Bend general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Bend wood flooring installation projects.
Wood Flooring Installation Bend Projects - Cost Breakdown:
- $212.92 to $222.30 - typical hourly labor costs seen for wood flooring installation Bend projects in 2014.
- $27.03 to $29.27 - typical costs associated with Bend wood flooring installation projects in 2014. This figure may include surface sealants, fasteners, fasteners, adhesives and manufacturer recommended underlayment, as required.
- $57.79 to $76.76 - 3" belt sander, 10" miter saw, 3 1/4" electric planer, electric jigsaw and pneumatic finish nailer costs, as well as any other necessary equipment and machinery.