Drywall Repair Cost in Mountain Home A F B, ID
LOW
AVERAGE
HIGH
What is the cost to Repair Drywall in Mountain Home A F B, ID?
Knowing the drywall repair in Mountain Home A F B costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Mountain Home A F B permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total drywall repair Mountain Home A F B costs have been $291.94 to $291.94.
To breakdown that number by patch the averages are $291.94 to $291.94 per patch. This number includes the following:
- Average labor costs per hour in Mountain Home A F B which are typical of drywall repair projects.
- Materials and equipment costs necessary to repair drywall in Mountain Home A F B, ID, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Mountain Home A F B permits required for drywall repair projects, which may also include inspection and building fees. Please contact Mountain Home A F B city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Mountain Home A F B, 83648 area.
- Supply and material county and state sales taxes in Elmore county, Idaho.
- Mountain Home A F B general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Mountain Home A F B drywall repair projects.
Drywall Repair Mountain Home A F B Projects - Cost Breakdown:
- $263.19 to $263.19 - typical hourly labor costs seen for drywall repair Mountain Home A F B projects in 2014.
- $28.75 to $28.75 - typical costs associated with Mountain Home A F B drywall repair projects in 2014. This figure may include top compound, fasteners and seam tape, as required.