Split Face Block Installation Cost in Tooele, UT
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Split Face Blocks in Tooele, UT?
Knowing the split face block installation in Tooele costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Tooele permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total split face block installation Tooele costs have been $2,206.48 to $2,684.12.
To breakdown that number by square foot the averages are $11.03 to $13.42 per square foot. This number includes the following:
- Average labor costs per hour in Tooele which are typical of split face block installation projects.
- Materials and equipment costs necessary to install split face blocks in Tooele, UT, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Tooele permits required for split face block installation projects, which may also include inspection and building fees. Please contact Tooele city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Tooele, 84074 area.
- Supply and material county and state sales taxes in Tooele county, Utah.
- Tooele general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Tooele split face block installation projects.
Split Face Block Installation Tooele Projects - Cost Breakdown:
- $1,387.05 to $1,649.30 - typical hourly labor costs seen for split face block installation Tooele projects in 2014.
- $83.24 to $90.14 - typical costs associated with Tooele split face block installation projects in 2014. This figure may include reinforcement, mortar and cutting and grinding materials, as required.
- $64.69 to $90.56 - small plate compactor, 5 cubic foot mortar box and 115 v wet masonry saw costs, as well as any other necessary equipment and machinery.
- $671.51 to $854.13 - Tooele retail costs typically seen for 200 square feet of split face block installation.