Forced Air Furnace Installation Cost in Beckley, WV
LOW
AVERAGE
HIGH
What is the cost to Install Forced Air Furnaces in Beckley, WV?
Knowing the forced air furnace installation in Beckley costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Beckley permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total forced air furnace installation Beckley costs have been $1,963.37 to $2,339.69.
To breakdown that number by furnace the averages are $1,963.37 to $2,339.69 per furnace. This number includes the following:
- Average labor costs per hour in Beckley which are typical of forced air furnace installation projects.
- Materials and equipment costs necessary to install forced air furnaces in Beckley, WV, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Beckley permits required for forced air furnace installation projects, which may also include inspection and building fees. Please contact Beckley city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Beckley, 25801 area.
- Supply and material county and state sales taxes in Raleigh county, West Virginia.
- Beckley general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Beckley forced air furnace installation projects.
Forced Air Furnace Installation Beckley Projects - Cost Breakdown:
- $395.07 to $413.72 - typical hourly labor costs seen for forced air furnace installation Beckley projects in 2014.
- $210.58 to $228.03 - typical costs associated with Beckley forced air furnace installation projects in 2014. This figure may include fittings, mounting hardware and fasteners, as required.
- $27.60 to $56.06 - pipe wrenches, pipe cutting and threading, brazing kit and tubing cutter costs, as well as any other necessary equipment and machinery.
- $1,330.12 to $1,641.87 - Beckley retail costs typically seen for 1 furnaces of forced air furnace installation.