Termite Damage Repair Cost in Sioux City, IA
$327.91
LOW
$344.19
AVERAGE
$360.46
HIGH
$327.91
LOW
$344.19
AVERAGE
$360.46
HIGH
What is the cost to Repair Termite Damage in Sioux City, IA?
Knowing the termite damage repair in Sioux City costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Sioux City permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total termite damage repair Sioux City costs have been $327.91 to $360.46.
To breakdown that number by structure the averages are $327.91 to $360.46 per structure. This number includes the following:
- Average labor costs per hour in Sioux City which are typical of termite damage repair projects.
- Materials and equipment costs necessary to repair termite damage in Sioux City, IA, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Sioux City permits required for termite damage repair projects, which may also include inspection and building fees. Please contact Sioux City city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Sioux City, 51101 area.
- Supply and material county and state sales taxes in Woodbury county, Iowa.
- Sioux City general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Sioux City termite damage repair projects.
Termite Damage Repair Sioux City Projects - Cost Breakdown:
- $255.77 to $282.34 - typical hourly labor costs seen for termite damage repair Sioux City projects in 2014.
- $72.14 to $78.12 - typical costs associated with Sioux City termite damage repair projects in 2014. This figure may include fasteners and connectors, as required.