Furnace Installation Cost in Hempstead, NY
$1,725.90
LOW
$1,901.03
AVERAGE
$2,076.15
HIGH
$1,725.90
LOW
$1,901.03
AVERAGE
$2,076.15
HIGH
What is the cost to Install Furnaces in Hempstead, NY?
Knowing the furnace installation in Hempstead costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Hempstead permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total furnace installation Hempstead costs have been $1,725.90 to $2,076.15.
To breakdown that number by furnace the averages are $1,725.90 to $2,076.15 per furnace. This number includes the following:
- Average labor costs per hour in Hempstead which are typical of furnace installation projects.
- Materials and equipment costs necessary to install furnaces in Hempstead, NY, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Hempstead permits required for furnace installation projects, which may also include inspection and building fees. Please contact Hempstead city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Hempstead, 11550 area.
- Supply and material county and state sales taxes in Nassau county, New York.
- Hempstead general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Hempstead furnace installation projects.
Furnace Installation Hempstead Projects - Cost Breakdown:
- $445.69 to $467.92 - typical hourly labor costs seen for furnace installation Hempstead projects in 2014.
- $213.62 to $231.33 - typical costs associated with Hempstead furnace installation projects in 2014. This figure may include fasteners, fittings and mounting hardware, as required.
- $27.60 to $56.06 - brazing kit, tubing cutter, pipe cutting and threading and pipe wrenches costs, as well as any other necessary equipment and machinery.
- $1,038.98 to $1,320.83 - Hempstead retail costs typically seen for 1 furnaces of furnace installation.