Gas Furnace Installation Cost in Norristown, PA
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Gas Furnaces in Norristown, PA?
Knowing the gas furnace installation in Norristown costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Norristown permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total gas furnace installation Norristown costs have been $1,639.37 to $1,984.77.
To breakdown that number by furnace the averages are $1,639.37 to $1,984.77 per furnace. This number includes the following:
- Average labor costs per hour in Norristown which are typical of gas furnace installation projects.
- Materials and equipment costs necessary to install gas furnaces in Norristown, PA, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Norristown permits required for gas furnace installation projects, which may also include inspection and building fees. Please contact Norristown city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Norristown, 19401 area.
- Supply and material county and state sales taxes in Montgomery county, Pennsylvania.
- Norristown general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Norristown gas furnace installation projects.
Gas Furnace Installation Norristown Projects - Cost Breakdown:
- $364.67 to $382.49 - typical hourly labor costs seen for gas furnace installation Norristown projects in 2014.
- $208.14 to $225.39 - typical costs associated with Norristown gas furnace installation projects in 2014. This figure may include mounting hardware, fittings and fasteners, as required.
- $27.60 to $56.06 - brazing kit, pipe wrenches, pipe cutting and threading and tubing cutter costs, as well as any other necessary equipment and machinery.
- $1,038.98 to $1,320.83 - Norristown retail costs typically seen for 1 furnaces of gas furnace installation.