Stamped Concrete Installation Cost in Sparks, NV
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Stamped Concrete in Sparks, NV?
Knowing the stamped concrete installation in Sparks costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Sparks permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total stamped concrete installation Sparks costs have been $2,967.78 to $3,252.48.
To breakdown that number by square foot the averages are $14.84 to $16.26 per square foot. This number includes the following:
- Average labor costs per hour in Sparks which are typical of stamped concrete installation projects.
- Materials and equipment costs necessary to install stamped concrete in Sparks, NV, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Sparks permits required for stamped concrete installation projects, which may also include inspection and building fees. Please contact Sparks city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Sparks, 89431 area.
- Supply and material county and state sales taxes in Washoe county, Nevada.
- Sparks general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Sparks stamped concrete installation projects.
Stamped Concrete Installation Sparks Projects - Cost Breakdown:
- $1,423.33 to $1,531.94 - typical hourly labor costs seen for stamped concrete installation Sparks projects in 2014.
- $21.09 to $28.75 - typical costs associated with Sparks stamped concrete installation projects in 2014. This figure may include isolation materials, reinforcing materials, chemical release agents and cleaning, as required.
- $69.00 to $122.48 - 48" bull float, 5+ cubic foot mortar mixing box with mortar hoe and reinforcing bar cutters costs, as well as any other necessary equipment and machinery.
- $1,454.36 to $1,569.31 - Sparks retail costs typically seen for 200 square feet of stamped concrete installation.