Gas Line Installation Cost in Southaven, MS
LOW
AVERAGE
HIGH
What is the cost to Install Gas Lines in Southaven, MS?
Knowing the gas line installation in Southaven costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Southaven permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total gas line installation Southaven costs have been $347.61 to $403.98.
To breakdown that number by line the averages are $347.61 to $403.98 per line. This number includes the following:
- Average labor costs per hour in Southaven which are typical of gas line installation projects.
- Materials and equipment costs necessary to install gas lines in Southaven, MS, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Southaven permits required for gas line installation projects, which may also include inspection and building fees. Please contact Southaven city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Southaven, 38671 area.
- Supply and material county and state sales taxes in DeSoto county, Mississippi.
- Southaven general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Southaven gas line installation projects.
Gas Line Installation Southaven Projects - Cost Breakdown:
- $181.29 to $197.70 - typical hourly labor costs seen for gas line installation Southaven projects in 2014.
- $138.72 to $150.22 - typical costs associated with Southaven gas line installation projects in 2014. This figure may include fittings, connectors and mounting hardware, as required.
- $27.60 to $56.06 - pipe cutting and threading, tubing cutter, pipe wrenches and brazing kit costs, as well as any other necessary equipment and machinery.