Countertop Refinishing Cost in Londonderry, NH
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Refinish Countertops in Londonderry, NH?
Knowing the countertop refinishing in Londonderry costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Londonderry permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total countertop refinishing Londonderry costs have been $781.06 to $1,458.50.
To breakdown that number by square foot the averages are $3.91 to $7.29 per square foot. This number includes the following:
- Average labor costs per hour in Londonderry which are typical of countertop refinishing projects.
- Materials and equipment costs necessary to refinish countertops in Londonderry, NH, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Londonderry permits required for countertop refinishing projects, which may also include inspection and building fees. Please contact Londonderry city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Londonderry, 03053 area.
- Supply and material county and state sales taxes in Rockingham county, New Hampshire.
- Londonderry general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Londonderry countertop refinishing projects.
Countertop Refinishing Londonderry Projects - Cost Breakdown:
- $670.08 to $1,338.32 - typical hourly labor costs seen for countertop refinishing Londonderry projects in 2014.
- $110.98 to $120.18 - typical costs associated with Londonderry countertop refinishing projects in 2014. This figure may include adhesives, connectors and fasteners, as required.