Closet Organizer Installation Cost in Fontana, CA
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Closet Organizers in Fontana, CA?
Knowing the closet organizer installation in Fontana costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Fontana permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total closet organizer installation Fontana costs have been $9,770.25 to $14,217.12.
To breakdown that number by square foot the averages are $48.85 to $71.08 per square foot. This number includes the following:
- Average labor costs per hour in Fontana which are typical of closet organizer installation projects.
- Materials and equipment costs necessary to install closet organizers in Fontana, CA, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Fontana permits required for closet organizer installation projects, which may also include inspection and building fees. Please contact Fontana city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Fontana, 92335 area.
- Supply and material county and state sales taxes in San Bernardino county, California.
- Fontana general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Fontana closet organizer installation projects.
Closet Organizer Installation Fontana Projects - Cost Breakdown:
- $3,841.87 to $7,783.09 - typical hourly labor costs seen for closet organizer installation Fontana projects in 2014.
- $5,870.59 to $6,357.27 - typical costs associated with Fontana closet organizer installation projects in 2014. This figure may include connectors, fasteners, surface preparation and finishing materials, as required.
- $57.79 to $76.76 - electric jigsaw, pneumatic finish nailer, 10" miter saw, 3" belt sander and 3 1/4" electric planer costs, as well as any other necessary equipment and machinery.