Stamped Concrete Installation Cost in Hampton, VA
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Stamped Concrete in Hampton, VA?
Knowing the stamped concrete installation in Hampton costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Hampton permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total stamped concrete installation Hampton costs have been $2,657.01 to $2,917.99.
To breakdown that number by square foot the averages are $13.28 to $14.59 per square foot. This number includes the following:
- Average labor costs per hour in Hampton which are typical of stamped concrete installation projects.
- Materials and equipment costs necessary to install stamped concrete in Hampton, VA, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Hampton permits required for stamped concrete installation projects, which may also include inspection and building fees. Please contact Hampton city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Hampton, 23661 area.
- Supply and material county and state sales taxes in Hampton City county, Virginia.
- Hampton general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Hampton stamped concrete installation projects.
Stamped Concrete Installation Hampton Projects - Cost Breakdown:
- $1,112.56 to $1,197.45 - typical hourly labor costs seen for stamped concrete installation Hampton projects in 2014.
- $21.09 to $28.75 - typical costs associated with Hampton stamped concrete installation projects in 2014. This figure may include cleaning, chemical release agents, reinforcing materials and isolation materials, as required.
- $69.00 to $122.48 - 5+ cubic foot mortar mixing box with mortar hoe, 48" bull float and reinforcing bar cutters costs, as well as any other necessary equipment and machinery.
- $1,454.36 to $1,569.31 - Hampton retail costs typically seen for 200 square feet of stamped concrete installation.