House Exterior Painting Cost in Barrington, RI
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Paint House Exteriors in Barrington, RI?
Knowing the house exterior painting in Barrington costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Barrington permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total house exterior painting Barrington costs have been $243.85 to $439.40.
To breakdown that number by square foot the averages are $1.22 to $2.20 per square foot. This number includes the following:
- Average labor costs per hour in Barrington which are typical of house exterior painting projects.
- Materials and equipment costs necessary to paint house exteriors in Barrington, RI, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Barrington permits required for house exterior painting projects, which may also include inspection and building fees. Please contact Barrington city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Barrington, 02806 area.
- Supply and material county and state sales taxes in Bristol county, Rhode Island.
- Barrington general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Barrington house exterior painting projects.
House Exterior Painting Barrington Projects - Cost Breakdown:
- $182.80 to $373.30 - typical hourly labor costs seen for house exterior painting Barrington projects in 2014.
- $61.04 to $66.10 - typical costs associated with Barrington house exterior painting projects in 2014. This figure may include cleanup supplies, surface repair material, masking tape and paper and solvents, as required.