Closet Organizer Installation Cost in Medford, MA
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Closet Organizers in Medford, MA?
Knowing the closet organizer installation in Medford costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Medford permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total closet organizer installation Medford costs have been $10,088.97 to $14,862.82.
To breakdown that number by square foot the averages are $50.45 to $74.31 per square foot. This number includes the following:
- Average labor costs per hour in Medford which are typical of closet organizer installation projects.
- Materials and equipment costs necessary to install closet organizers in Medford, MA, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Medford permits required for closet organizer installation projects, which may also include inspection and building fees. Please contact Medford city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Medford, 02155 area.
- Supply and material county and state sales taxes in Middlesex county, Massachusetts.
- Medford general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Medford closet organizer installation projects.
Closet Organizer Installation Medford Projects - Cost Breakdown:
- $4,160.60 to $8,428.79 - typical hourly labor costs seen for closet organizer installation Medford projects in 2014.
- $5,870.59 to $6,357.27 - typical costs associated with Medford closet organizer installation projects in 2014. This figure may include surface preparation, fasteners, finishing materials and connectors, as required.
- $57.79 to $76.76 - 3" belt sander, electric jigsaw, pneumatic finish nailer, 3 1/4" electric planer and 10" miter saw costs, as well as any other necessary equipment and machinery.