Oil Furnace Installation Cost in Lisle, IL
LOW
AVERAGE
HIGH
What is the cost to Install Oil Furnaces in Lisle, IL?
Knowing the oil furnace installation in Lisle costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Lisle permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total oil furnace installation Lisle costs have been $1,847.76 to $2,253.25.
To breakdown that number by furnace the averages are $1,847.76 to $2,253.25 per furnace. This number includes the following:
- Average labor costs per hour in Lisle which are typical of oil furnace installation projects.
- Materials and equipment costs necessary to install oil furnaces in Lisle, IL, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Lisle permits required for oil furnace installation projects, which may also include inspection and building fees. Please contact Lisle city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Lisle, 60532 area.
- Supply and material county and state sales taxes in Dupage county, Illinois.
- Lisle general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Lisle oil furnace installation projects.
Oil Furnace Installation Lisle Projects - Cost Breakdown:
- $388.85 to $408.11 - typical hourly labor costs seen for oil furnace installation Lisle projects in 2014.
- $72.58 to $78.59 - typical costs associated with Lisle oil furnace installation projects in 2014. This figure may include fittings, fasteners and mounting hardware, as required.
- $27.60 to $56.06 - brazing kit, pipe cutting and threading, tubing cutter and pipe wrenches costs, as well as any other necessary equipment and machinery.
- $1,358.74 to $1,710.49 - Lisle retail costs typically seen for 1 furnaces of oil furnace installation.