Oil Furnace Installation Cost in Providence, RI
LOW
AVERAGE
HIGH
What is the cost to Install Oil Furnaces in Providence, RI?
Knowing the oil furnace installation in Providence costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Providence permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total oil furnace installation Providence costs have been $1,841.08 to $2,246.24.
To breakdown that number by furnace the averages are $1,841.08 to $2,246.24 per furnace. This number includes the following:
- Average labor costs per hour in Providence which are typical of oil furnace installation projects.
- Materials and equipment costs necessary to install oil furnaces in Providence, RI, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Providence permits required for oil furnace installation projects, which may also include inspection and building fees. Please contact Providence city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Providence, 02903 area.
- Supply and material county and state sales taxes in Providence county, Rhode Island.
- Providence general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Providence oil furnace installation projects.
Oil Furnace Installation Providence Projects - Cost Breakdown:
- $382.17 to $401.11 - typical hourly labor costs seen for oil furnace installation Providence projects in 2014.
- $72.58 to $78.59 - typical costs associated with Providence oil furnace installation projects in 2014. This figure may include fasteners, fittings and mounting hardware, as required.
- $27.60 to $56.06 - tubing cutter, brazing kit, pipe cutting and threading and pipe wrenches costs, as well as any other necessary equipment and machinery.
- $1,358.74 to $1,710.49 - Providence retail costs typically seen for 1 furnaces of oil furnace installation.