Knowing the stamped concrete installation in Knoxville costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Knoxville permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total stamped concrete installation Knoxville costs have been $2,705.49 to $2,970.16.
To breakdown that number by square foot the averages are $13.52 to $14.85 per square foot. This number includes the following:
- Average labor costs per hour in Knoxville which are typical of stamped concrete installation projects.
- Materials and equipment costs necessary to install stamped concrete in Knoxville, TN, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Knoxville permits required for stamped concrete installation projects, which may also include inspection and building fees. Please contact Knoxville city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Knoxville, 37902 area.
- Supply and material county and state sales taxes in Knox county, Tennessee.
- Knoxville general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Knoxville stamped concrete installation projects.
Stamped Concrete Installation Knoxville Projects - Cost Breakdown:
- $1,161.04 to $1,249.62 - typical hourly labor costs seen for stamped concrete installation Knoxville projects in 2014.
- $21.09 to $28.75 - typical costs associated with Knoxville stamped concrete installation projects in 2014. This figure may include reinforcing materials, isolation materials, chemical release agents and cleaning, as required.
- $69.00 to $122.48 - 48" bull float, 5+ cubic foot mortar mixing box with mortar hoe and reinforcing bar cutters costs, as well as any other necessary equipment and machinery.
- $1,454.36 to $1,569.31 - Knoxville retail costs typically seen for 200 square feet of stamped concrete installation.