Garbage Disposal Replacement Cost in Schaumburg, IL
LOW
AVERAGE
HIGH
What is the cost to Replace Garbage Disposals in Schaumburg, IL?
Knowing the garbage disposal replacement in Schaumburg costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Schaumburg permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total garbage disposal replacement Schaumburg costs have been $409.88 to $436.17.
To breakdown that number by disposal the averages are $409.88 to $436.17 per disposal. This number includes the following:
- Average labor costs per hour in Schaumburg which are typical of garbage disposal replacement projects.
- Materials and equipment costs necessary to replace garbage disposals in Schaumburg, IL, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Schaumburg permits required for garbage disposal replacement projects, which may also include inspection and building fees. Please contact Schaumburg city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Schaumburg, 60173 area.
- Supply and material county and state sales taxes in Cook county, Illinois.
- Schaumburg general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Schaumburg garbage disposal replacement projects.
Garbage Disposal Replacement Schaumburg Projects - Cost Breakdown:
- $170.73 to $177.20 - typical hourly labor costs seen for garbage disposal replacement Schaumburg projects in 2014.
- $239.15 to $258.98 - typical costs associated with Schaumburg garbage disposal replacement projects in 2014. This figure may include mounting hardware, connectors and fittings, as required.