Hardwood Floor Repairs Cost in Bella Vista, AR
LOW
AVERAGE
HIGH
What is the cost to Repair Hardwood Floors in Bella Vista, AR?
Knowing the hardwood floor repairs in Bella Vista costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Bella Vista permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total hardwood floor repairs Bella Vista costs have been $266.50 to $295.06.
To breakdown that number by repair the averages are $266.50 to $295.06 per repair. This number includes the following:
- Average labor costs per hour in Bella Vista which are typical of hardwood floor repairs projects.
- Materials and equipment costs necessary to repair hardwood floors in Bella Vista, AR, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Bella Vista permits required for hardwood floor repairs projects, which may also include inspection and building fees. Please contact Bella Vista city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Bella Vista, 72714 area.
- Supply and material county and state sales taxes in Benton county, Arkansas.
- Bella Vista general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Bella Vista hardwood floor repairs projects.
Hardwood Floor Repairs Bella Vista Projects - Cost Breakdown:
- $171.63 to $179.48 - typical hourly labor costs seen for hardwood floor repairs Bella Vista projects in 2014.
- $51.75 to $51.75 - typical costs associated with Bella Vista hardwood floor repairs projects in 2014. This figure may include adhesives, surface sealants, fasteners and manufacturer recommended underlayment, as required.
- $43.13 to $63.83 - up to 3/4" thick flooring and pneumatic nailer for 1 1/2" to 2" nails costs, as well as any other necessary equipment and machinery.