What is the cost to Cleanup Flood Damage in South Portland, ME?
Knowing the flood cleanup in South Portland costs is important to being able to effectively plan and budget your water damage restoration project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain South Portland permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total flood cleanup South Portland costs have been $3,735.46 to $4,345.16.
To breakdown that number by square foot the averages are $18.68 to $21.72 per square foot. This number includes the following:
- Average labor costs per hour in South Portland which are typical of flood cleanup projects.
- Materials and equipment costs necessary to cleanup flood damage in South Portland, ME, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- South Portland permits required for flood cleanup projects, which may also include inspection and building fees. Please contact South Portland city government to inquire which permits may be necessary.
- Supply and material city sales taxes in South Portland, 04106 area.
- Supply and material county and state sales taxes in Cumberland county, Maine.
- South Portland general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for South Portland flood cleanup projects.
Flood Cleanup South Portland Projects - Cost Breakdown:
- $3,014.12 to $3,564.01 - typical hourly labor costs seen for flood cleanup South Portland projects in 2014.
- $721.35 to $781.15 - typical costs associated with South Portland flood cleanup projects in 2014. This figure may include connectors and fasteners, as required.