Trim Molding Installation Cost in Akron, OH
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Trim Molding in Akron, OH?
Knowing the trim molding installation in Akron costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Akron permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total trim molding installation Akron costs have been $270.97 to $483.91.
To breakdown that number by linear foot the averages are $5.42 to $9.68 per linear foot. This number includes the following:
- Average labor costs per hour in Akron which are typical of trim molding installation projects.
- Materials and equipment costs necessary to install trim molding in Akron, OH, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Akron permits required for trim molding installation projects, which may also include inspection and building fees. Please contact Akron city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Akron, 44301 area.
- Supply and material county and state sales taxes in Summit county, Ohio.
- Akron general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Akron trim molding installation projects.
Trim Molding Installation Akron Projects - Cost Breakdown:
- $104.01 to $195.34 - typical hourly labor costs seen for trim molding installation Akron projects in 2014.
- $42.17 to $45.67 - typical costs associated with Akron trim molding installation projects in 2014. This figure may include finishing materials, fasteners, connectors and surface preparation, as required.
- $73.31 to $99.19 - biscuit joiner, er, pneumatic finish nailer, 12" compound miter saw and detail s costs, as well as any other necessary equipment and machinery.
- $51.49 to $143.72 - Akron retail costs typically seen for 50 linear feet of trim molding installation.