Flood Cleanup Cost in West Palm Beach, FL
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Cleanup Flood Damage in West Palm Beach, FL?
Knowing the flood cleanup in West Palm Beach costs is important to being able to effectively plan and budget your water damage restoration project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain West Palm Beach permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total flood cleanup West Palm Beach costs have been $3,433.16 to $3,987.72.
To breakdown that number by square foot the averages are $17.17 to $19.94 per square foot. This number includes the following:
- Average labor costs per hour in West Palm Beach which are typical of flood cleanup projects.
- Materials and equipment costs necessary to cleanup flood damage in West Palm Beach, FL, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- West Palm Beach permits required for flood cleanup projects, which may also include inspection and building fees. Please contact West Palm Beach city government to inquire which permits may be necessary.
- Supply and material city sales taxes in West Palm Beach, 33401 area.
- Supply and material county and state sales taxes in Palm Beach county, Florida.
- West Palm Beach general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for West Palm Beach flood cleanup projects.
Flood Cleanup West Palm Beach Projects - Cost Breakdown:
- $2,711.82 to $3,206.57 - typical hourly labor costs seen for flood cleanup West Palm Beach projects in 2014.
- $721.35 to $781.15 - typical costs associated with West Palm Beach flood cleanup projects in 2014. This figure may include fasteners and connectors, as required.