Oil Furnace Installation Cost in Broken Arrow, OK
LOW
AVERAGE
HIGH
What is the cost to Install Oil Furnaces in Broken Arrow, OK?
Knowing the oil furnace installation in Broken Arrow costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Broken Arrow permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total oil furnace installation Broken Arrow costs have been $1,747.95 to $2,148.51.
To breakdown that number by furnace the averages are $1,747.95 to $2,148.51 per furnace. This number includes the following:
- Average labor costs per hour in Broken Arrow which are typical of oil furnace installation projects.
- Materials and equipment costs necessary to install oil furnaces in Broken Arrow, OK, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Broken Arrow permits required for oil furnace installation projects, which may also include inspection and building fees. Please contact Broken Arrow city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Broken Arrow, 74011 area.
- Supply and material county and state sales taxes in Tulsa county, Oklahoma.
- Broken Arrow general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Broken Arrow oil furnace installation projects.
Oil Furnace Installation Broken Arrow Projects - Cost Breakdown:
- $289.05 to $303.37 - typical hourly labor costs seen for oil furnace installation Broken Arrow projects in 2014.
- $72.58 to $78.59 - typical costs associated with Broken Arrow oil furnace installation projects in 2014. This figure may include mounting hardware, fittings and fasteners, as required.
- $27.60 to $56.06 - brazing kit, pipe wrenches, pipe cutting and threading and tubing cutter costs, as well as any other necessary equipment and machinery.
- $1,358.74 to $1,710.49 - Broken Arrow retail costs typically seen for 1 furnaces of oil furnace installation.