Wood Flooring Installation Cost in Brick, NJ
$305.66
LOW
$321.13
AVERAGE
$336.59
HIGH
What is the cost to Repair Wood Flooring in Brick, NJ?
Knowing the wood flooring installation in Brick costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Brick permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total wood flooring installation Brick costs have been $305.66 to $336.59.
To breakdown that number by repair the averages are $305.66 to $336.59 per repair. This number includes the following:
- Average labor costs per hour in Brick which are typical of wood flooring installation projects.
- Materials and equipment costs necessary to repair wood flooring in Brick, NJ, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Brick permits required for wood flooring installation projects, which may also include inspection and building fees. Please contact Brick city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Brick, 08723 area.
- Supply and material county and state sales taxes in Ocean county, New Jersey.
- Brick general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Brick wood flooring installation projects.
Wood Flooring Installation Brick Projects - Cost Breakdown:
- $220.85 to $230.56 - typical hourly labor costs seen for wood flooring installation Brick projects in 2014.
- $27.03 to $29.27 - typical costs associated with Brick wood flooring installation projects in 2014. This figure may include fasteners, surface sealants, adhesives, fasteners and manufacturer recommended underlayment, as required.
- $57.79 to $76.76 - 10" miter saw, 3" belt sander, electric jigsaw, 3 1/4" electric planer and pneumatic finish nailer costs, as well as any other necessary equipment and machinery.