Garbage Disposal Replacement Cost in Miles City, MT
LOW
AVERAGE
HIGH
What is the cost to Replace Garbage Disposals in Miles City, MT?
Knowing the garbage disposal replacement in Miles City costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Miles City permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total garbage disposal replacement Miles City costs have been $378.28 to $403.37.
To breakdown that number by disposal the averages are $378.28 to $403.37 per disposal. This number includes the following:
- Average labor costs per hour in Miles City which are typical of garbage disposal replacement projects.
- Materials and equipment costs necessary to replace garbage disposals in Miles City, MT, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Miles City permits required for garbage disposal replacement projects, which may also include inspection and building fees. Please contact Miles City city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Miles City, 59301 area.
- Supply and material county and state sales taxes in Custer county, Montana.
- Miles City general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Miles City garbage disposal replacement projects.
Garbage Disposal Replacement Miles City Projects - Cost Breakdown:
- $139.13 to $144.41 - typical hourly labor costs seen for garbage disposal replacement Miles City projects in 2014.
- $239.15 to $258.98 - typical costs associated with Miles City garbage disposal replacement projects in 2014. This figure may include connectors, fittings and mounting hardware, as required.