Stamped Concrete Installation Cost in Gretna, LA
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Stamped Concrete in Gretna, LA?
Knowing the stamped concrete installation in Gretna costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Gretna permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total stamped concrete installation Gretna costs have been $2,670.68 to $2,932.71.
To breakdown that number by square foot the averages are $13.35 to $14.66 per square foot. This number includes the following:
- Average labor costs per hour in Gretna which are typical of stamped concrete installation projects.
- Materials and equipment costs necessary to install stamped concrete in Gretna, LA, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Gretna permits required for stamped concrete installation projects, which may also include inspection and building fees. Please contact Gretna city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Gretna, 70053 area.
- Supply and material county and state sales taxes in Jefferson Parish county, Louisiana.
- Gretna general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Gretna stamped concrete installation projects.
Stamped Concrete Installation Gretna Projects - Cost Breakdown:
- $1,126.23 to $1,212.17 - typical hourly labor costs seen for stamped concrete installation Gretna projects in 2014.
- $21.09 to $28.75 - typical costs associated with Gretna stamped concrete installation projects in 2014. This figure may include cleaning, isolation materials, chemical release agents and reinforcing materials, as required.
- $69.00 to $122.48 - reinforcing bar cutters, 5+ cubic foot mortar mixing box with mortar hoe and 48" bull float costs, as well as any other necessary equipment and machinery.
- $1,454.36 to $1,569.31 - Gretna retail costs typically seen for 200 square feet of stamped concrete installation.