Water Damage Repair Cost in Terre Haute, IN
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Repair Water Damage in Terre Haute, IN?
Knowing the water damage repair in Terre Haute costs is important to being able to effectively plan and budget your water damage restoration project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Terre Haute permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total water damage repair Terre Haute costs have been $2,565.91 to $2,707.79.
To breakdown that number by square foot the averages are $12.83 to $13.54 per square foot. This number includes the following:
- Average labor costs per hour in Terre Haute which are typical of water damage repair projects.
- Materials and equipment costs necessary to repair water damage in Terre Haute, IN, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Terre Haute permits required for water damage repair projects, which may also include inspection and building fees. Please contact Terre Haute city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Terre Haute, 47802 area.
- Supply and material county and state sales taxes in Vigo county, Indiana.
- Terre Haute general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Terre Haute water damage repair projects.
Water Damage Repair Terre Haute Projects - Cost Breakdown:
- $1,844.57 to $1,926.64 - typical hourly labor costs seen for water damage repair Terre Haute projects in 2014.
- $721.35 to $781.15 - typical costs associated with Terre Haute water damage repair projects in 2014. This figure may include fasteners and connectors, as required.