Oil Boiler Installation Cost in West Haven, CT
LOW
AVERAGE
HIGH
What is the cost to Install Oil Boilers in West Haven, CT?
Knowing the oil boiler installation in West Haven costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain West Haven permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total oil boiler installation West Haven costs have been $3,205.77 to $3,549.00.
To breakdown that number by boiler the averages are $3,205.77 to $3,549.00 per boiler. This number includes the following:
- Average labor costs per hour in West Haven which are typical of oil boiler installation projects.
- Materials and equipment costs necessary to install oil boilers in West Haven, CT, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- West Haven permits required for oil boiler installation projects, which may also include inspection and building fees. Please contact West Haven city government to inquire which permits may be necessary.
- Supply and material city sales taxes in West Haven, 06516 area.
- Supply and material county and state sales taxes in New Haven county, Connecticut.
- West Haven general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for West Haven oil boiler installation projects.
Oil Boiler Installation West Haven Projects - Cost Breakdown:
- $339.43 to $386.18 - typical hourly labor costs seen for oil boiler installation West Haven projects in 2014.
- $77.07 to $83.47 - typical costs associated with West Haven oil boiler installation projects in 2014. This figure may include fittings, fasteners and mounting hardware, as required.
- $27.60 to $56.06 - pipe cutting and threading, tubing cutter, brazing kit and pipe wrenches costs, as well as any other necessary equipment and machinery.
- $2,761.67 to $3,023.29 - West Haven retail costs typically seen for 1 boilers of oil boiler installation.