What is the cost to Stain Wood Flooring in Mandan, ND?
Knowing the wood floor staining and finishing in Mandan costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Mandan permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total wood floor staining and finishing Mandan costs have been $211.30 to $223.19.
To breakdown that number by square foot the averages are $1.06 to $1.12 per square foot. This number includes the following:
- Average labor costs per hour in Mandan which are typical of wood floor staining and finishing projects.
- Materials and equipment costs necessary to stain wood flooring in Mandan, ND, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Mandan permits required for wood floor staining and finishing projects, which may also include inspection and building fees. Please contact Mandan city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Mandan, 58554 area.
- Supply and material county and state sales taxes in Morton county, North Dakota.
- Mandan general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Mandan wood floor staining and finishing projects.
Wood Floor Staining And Finishing Mandan Projects - Cost Breakdown:
- $155.80 to $163.09 - typical hourly labor costs seen for wood floor staining and finishing Mandan projects in 2014.
- $55.50 to $60.10 - typical costs associated with Mandan wood floor staining and finishing projects in 2014. This figure may include surface sealants, fasteners, manufacturer recommended underlayment and adhesives, as required.