Closet Organizer Installation Cost in Quincy, MA
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Install Closet Organizers in Quincy, MA?
Knowing the closet organizer installation in Quincy costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Quincy permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total closet organizer installation Quincy costs have been $10,088.97 to $14,862.82.
To breakdown that number by square foot the averages are $50.45 to $74.31 per square foot. This number includes the following:
- Average labor costs per hour in Quincy which are typical of closet organizer installation projects.
- Materials and equipment costs necessary to install closet organizers in Quincy, MA, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Quincy permits required for closet organizer installation projects, which may also include inspection and building fees. Please contact Quincy city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Quincy, 02169 area.
- Supply and material county and state sales taxes in Norfolk county, Massachusetts.
- Quincy general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Quincy closet organizer installation projects.
Closet Organizer Installation Quincy Projects - Cost Breakdown:
- $4,160.60 to $8,428.79 - typical hourly labor costs seen for closet organizer installation Quincy projects in 2014.
- $5,870.59 to $6,357.27 - typical costs associated with Quincy closet organizer installation projects in 2014. This figure may include surface preparation, connectors, fasteners and finishing materials, as required.
- $57.79 to $76.76 - 3" belt sander, 10" miter saw, electric jigsaw, pneumatic finish nailer and 3 1/4" electric planer costs, as well as any other necessary equipment and machinery.