What is the cost to Install Tile Flooring in Sheridan, WY?
Knowing the tile floor installation in Sheridan costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Sheridan permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total tile floor installation Sheridan costs have been $1,612.45 to $2,374.80.
To breakdown that number by square foot the averages are $8.06 to $11.88 per square foot. This number includes the following:
- Average labor costs per hour in Sheridan which are typical of tile floor installation projects.
- Materials and equipment costs necessary to install tile flooring in Sheridan, WY, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Sheridan permits required for tile floor installation projects, which may also include inspection and building fees. Please contact Sheridan city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Sheridan, 82801 area.
- Supply and material county and state sales taxes in Sheridan county, Wyoming.
- Sheridan general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Sheridan tile floor installation projects.
Tile Floor Installation Sheridan Projects - Cost Breakdown:
- $982.39 to $1,213.97 - typical hourly labor costs seen for tile floor installation Sheridan projects in 2014.
- $207.53 to $224.73 - typical costs associated with Sheridan tile floor installation projects in 2014. This figure may include adhesives, fabrication and polishing disposables, fasteners, surface sealants and manufacturer recommended underlayment, as required.
- $60.38 to $90.56 - power mortar mixer, 10" diameter diamond wet tile and stone saw and mortar box costs, as well as any other necessary equipment and machinery.
- $362.16 to $845.53 - Sheridan retail costs typically seen for 200 square feet of tile floor installation.