Wood Flooring Installation Cost in Pawtucket, RI
LOW
AVERAGE
HIGH
What is the cost to Repair Wood Flooring in Pawtucket, RI?
Knowing the wood flooring installation in Pawtucket costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Pawtucket permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total wood flooring installation Pawtucket costs have been $303.83 to $334.68.
To breakdown that number by repair the averages are $303.83 to $334.68 per repair. This number includes the following:
- Average labor costs per hour in Pawtucket which are typical of wood flooring installation projects.
- Materials and equipment costs necessary to repair wood flooring in Pawtucket, RI, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Pawtucket permits required for wood flooring installation projects, which may also include inspection and building fees. Please contact Pawtucket city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Pawtucket, 02860 area.
- Supply and material county and state sales taxes in Providence county, Rhode Island.
- Pawtucket general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Pawtucket wood flooring installation projects.
Wood Flooring Installation Pawtucket Projects - Cost Breakdown:
- $219.02 to $228.65 - typical hourly labor costs seen for wood flooring installation Pawtucket projects in 2014.
- $27.03 to $29.27 - typical costs associated with Pawtucket wood flooring installation projects in 2014. This figure may include fasteners, surface sealants, manufacturer recommended underlayment, fasteners and adhesives, as required.
- $57.79 to $76.76 - 10" miter saw, 3" belt sander, pneumatic finish nailer, 3 1/4" electric planer and electric jigsaw costs, as well as any other necessary equipment and machinery.