Kitchen Cabinet Installation Cost in Bowie, MD
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Hang Kitchen Cabinets in Bowie, MD?
Knowing the kitchen cabinet installation in Bowie costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Bowie permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total kitchen cabinet installation Bowie costs have been $14,295.45 to $19,198.45.
To breakdown that number by linear foot the averages are $285.91 to $383.97 per linear foot. This number includes the following:
- Average labor costs per hour in Bowie which are typical of kitchen cabinet installation projects.
- Materials and equipment costs necessary to hang kitchen cabinets in Bowie, MD, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Bowie permits required for kitchen cabinet installation projects, which may also include inspection and building fees. Please contact Bowie city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Bowie, 20715 area.
- Supply and material county and state sales taxes in Prince George's county, Maryland.
- Bowie general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Bowie kitchen cabinet installation projects.
Kitchen Cabinet Installation Bowie Projects - Cost Breakdown:
- $2,323.56 to $4,258.52 - typical hourly labor costs seen for kitchen cabinet installation Bowie projects in 2014.
- $357.90 to $387.57 - typical costs associated with Bowie kitchen cabinet installation projects in 2014. This figure may include connectors, surface preparation, finishing materials and fasteners, as required.
- $57.79 to $76.76 - electric jigsaw, 10" miter saw, 3" belt sander, 3 1/4" electric planer and pneumatic finish nailer costs, as well as any other necessary equipment and machinery.
- $11,556.21 to $14,475.59 - Bowie retail costs typically seen for 50 linear feet of kitchen cabinet installation.