Kitchen Cabinet Installation Cost in Olive Branch, MS
LOW
AVERAGE
HIGH
LOW
AVERAGE
HIGH
What is the cost to Hang Kitchen Cabinets in Olive Branch, MS?
Knowing the kitchen cabinet installation in Olive Branch costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Olive Branch permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total kitchen cabinet installation Olive Branch costs have been $13,995.94 to $18,649.50.
To breakdown that number by linear foot the averages are $279.92 to $372.99 per linear foot. This number includes the following:
- Average labor costs per hour in Olive Branch which are typical of kitchen cabinet installation projects.
- Materials and equipment costs necessary to hang kitchen cabinets in Olive Branch, MS, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Olive Branch permits required for kitchen cabinet installation projects, which may also include inspection and building fees. Please contact Olive Branch city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Olive Branch, 38654 area.
- Supply and material county and state sales taxes in DeSoto county, Mississippi.
- Olive Branch general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Olive Branch kitchen cabinet installation projects.
Kitchen Cabinet Installation Olive Branch Projects - Cost Breakdown:
- $2,024.05 to $3,709.59 - typical hourly labor costs seen for kitchen cabinet installation Olive Branch projects in 2014.
- $357.90 to $387.57 - typical costs associated with Olive Branch kitchen cabinet installation projects in 2014. This figure may include connectors, fasteners, finishing materials and surface preparation, as required.
- $57.79 to $76.76 - 3 1/4" electric planer, 10" miter saw, pneumatic finish nailer, electric jigsaw and 3" belt sander costs, as well as any other necessary equipment and machinery.
- $11,556.21 to $14,475.59 - Olive Branch retail costs typically seen for 50 linear feet of kitchen cabinet installation.