What is the cost to Install Gas Lines in Mount Pleasant, SC?
Knowing the gas line installation in Mount Pleasant costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Mount Pleasant permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total gas line installation Mount Pleasant costs have been $349.50 to $406.04.
To breakdown that number by line the averages are $349.50 to $406.04 per line. This number includes the following:
- Average labor costs per hour in Mount Pleasant which are typical of gas line installation projects.
- Materials and equipment costs necessary to install gas lines in Mount Pleasant, SC, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Mount Pleasant permits required for gas line installation projects, which may also include inspection and building fees. Please contact Mount Pleasant city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Mount Pleasant, 29464 area.
- Supply and material county and state sales taxes in Charleston county, South Carolina.
- Mount Pleasant general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Mount Pleasant gas line installation projects.
Gas Line Installation Mount Pleasant Projects - Cost Breakdown:
- $183.17 to $199.76 - typical hourly labor costs seen for gas line installation Mount Pleasant projects in 2014.
- $138.72 to $150.22 - typical costs associated with Mount Pleasant gas line installation projects in 2014. This figure may include connectors, fittings and mounting hardware, as required.
- $27.60 to $56.06 - pipe wrenches, brazing kit, pipe cutting and threading and tubing cutter costs, as well as any other necessary equipment and machinery.