RTA Cabinet Installation Cost in Portage, IN
$162.66
LOW
$205.56
AVERAGE
$248.45
HIGH
What is the cost to Install RTA Cabinets in Portage, IN?
Knowing the rta cabinet installation in Portage costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Portage permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total rta cabinet installation Portage costs have been $162.66 to $248.45.
To breakdown that number by cabinet the averages are $162.66 to $248.45 per cabinet. This number includes the following:
- Average labor costs per hour in Portage which are typical of rta cabinet installation projects.
- Materials and equipment costs necessary to install rta cabinets in Portage, IN, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Portage permits required for rta cabinet installation projects, which may also include inspection and building fees. Please contact Portage city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Portage, 46368 area.
- Supply and material county and state sales taxes in Porter county, Indiana.
- Portage general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Portage rta cabinet installation projects.
RTA Cabinet Installation Portage Projects - Cost Breakdown:
- $81.87 to $142.93 - typical hourly labor costs seen for rta cabinet installation Portage projects in 2014.
- $23.00 to $28.75 - typical costs associated with Portage rta cabinet installation projects in 2014. This figure may include surface preparation, fasteners, connectors and finishing materials, as required.
- $57.79 to $76.76 - 10" miter saw, 3" belt sander, pneumatic finish nailer, electric jigsaw and 3 1/4" electric planer costs, as well as any other necessary equipment and machinery.