What is the cost to Install Gas Lines in Gillette, WY?
Knowing the gas line installation in Gillette costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Gillette permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total gas line installation Gillette costs have been $372.97 to $431.63.
To breakdown that number by line the averages are $372.97 to $431.63 per line. This number includes the following:
- Average labor costs per hour in Gillette which are typical of gas line installation projects.
- Materials and equipment costs necessary to install gas lines in Gillette, WY, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Gillette permits required for gas line installation projects, which may also include inspection and building fees. Please contact Gillette city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Gillette, 82716 area.
- Supply and material county and state sales taxes in Campbell county, Wyoming.
- Gillette general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Gillette gas line installation projects.
Gas Line Installation Gillette Projects - Cost Breakdown:
- $206.66 to $225.35 - typical hourly labor costs seen for gas line installation Gillette projects in 2014.
- $138.72 to $150.22 - typical costs associated with Gillette gas line installation projects in 2014. This figure may include mounting hardware, connectors and fittings, as required.
- $27.60 to $56.06 - brazing kit, pipe wrenches, tubing cutter and pipe cutting and threading costs, as well as any other necessary equipment and machinery.