Knowing the gas line installation in Martinsburg costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain Martinsburg permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total gas line installation Martinsburg costs have been $384.92 to $444.66.
To breakdown that number by line the averages are $384.92 to $444.66 per line. This number includes the following:
- Average labor costs per hour in Martinsburg which are typical of gas line installation projects.
- Materials and equipment costs necessary to install gas lines in Martinsburg, WV, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- Martinsburg permits required for gas line installation projects, which may also include inspection and building fees. Please contact Martinsburg city government to inquire which permits may be necessary.
- Supply and material city sales taxes in Martinsburg, 25401 area.
- Supply and material county and state sales taxes in Berkeley county, West Virginia.
- Martinsburg general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for Martinsburg gas line installation projects.
Gas Line Installation Martinsburg Projects - Cost Breakdown:
- $218.59 to $238.38 - typical hourly labor costs seen for gas line installation Martinsburg projects in 2014.
- $138.72 to $150.22 - typical costs associated with Martinsburg gas line installation projects in 2014. This figure may include fittings, connectors and mounting hardware, as required.
- $27.60 to $56.06 - pipe wrenches, pipe cutting and threading, brazing kit and tubing cutter costs, as well as any other necessary equipment and machinery.