Gas Line Installation Cost in New Berlin, WI
LOW
AVERAGE
HIGH
What is the cost to Install Gas Lines in New Berlin, WI?
Knowing the gas line installation in New Berlin costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain New Berlin permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total gas line installation New Berlin costs have been $385.96 to $445.81.
To breakdown that number by line the averages are $385.96 to $445.81 per line. This number includes the following:
- Average labor costs per hour in New Berlin which are typical of gas line installation projects.
- Materials and equipment costs necessary to install gas lines in New Berlin, WI, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- New Berlin permits required for gas line installation projects, which may also include inspection and building fees. Please contact New Berlin city government to inquire which permits may be necessary.
- Supply and material city sales taxes in New Berlin, 53146 area.
- Supply and material county and state sales taxes in Waukesha county, Wisconsin.
- New Berlin general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for New Berlin gas line installation projects.
Gas Line Installation New Berlin Projects - Cost Breakdown:
- $219.65 to $239.52 - typical hourly labor costs seen for gas line installation New Berlin projects in 2014.
- $138.72 to $150.22 - typical costs associated with New Berlin gas line installation projects in 2014. This figure may include connectors, fittings and mounting hardware, as required.
- $27.60 to $56.06 - brazing kit, pipe cutting and threading, pipe wrenches and tubing cutter costs, as well as any other necessary equipment and machinery.