Cabinet Installation Cost in New Bedford, MA
LOW
AVERAGE
HIGH
What is the cost to Install Cabinets in New Bedford, MA?
Knowing the cabinet installation in New Bedford costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain New Bedford permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total cabinet installation New Bedford costs have been $159.63 to $243.18.
To breakdown that number by cabinet the averages are $159.63 to $243.18 per cabinet. This number includes the following:
- Average labor costs per hour in New Bedford which are typical of cabinet installation projects.
- Materials and equipment costs necessary to install cabinets in New Bedford, MA, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- New Bedford permits required for cabinet installation projects, which may also include inspection and building fees. Please contact New Bedford city government to inquire which permits may be necessary.
- Supply and material city sales taxes in New Bedford, 02740 area.
- Supply and material county and state sales taxes in Bristol county, Massachusetts.
- New Bedford general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for New Bedford cabinet installation projects.
Cabinet Installation New Bedford Projects - Cost Breakdown:
- $78.84 to $137.67 - typical hourly labor costs seen for cabinet installation New Bedford projects in 2014.
- $23.00 to $28.75 - typical costs associated with New Bedford cabinet installation projects in 2014. This figure may include connectors, fasteners, surface preparation and finishing materials, as required.
- $57.79 to $76.76 - pneumatic finish nailer, 3" belt sander, 10" miter saw, electric jigsaw and 3 1/4" electric planer costs, as well as any other necessary equipment and machinery.