Cabinet Installation Cost in North Little Rock, AR
LOW
AVERAGE
HIGH
What is the cost to Install Cabinets in North Little Rock, AR?
Knowing the cabinet installation in North Little Rock costs is important to being able to effectively plan and budget your project. While there are general nationwide numbers available, they usually do not include local factors that may impact the final price, which may include: local hourly labor wages, materials costs, as well as productivity rates. There may be certain North Little Rock permits required by local state and city laws, which can raise the total cost as well.
Our numbers show that on average in 2014 total cabinet installation North Little Rock costs have been $144.76 to $217.21.
To breakdown that number by cabinet the averages are $144.76 to $217.21 per cabinet. This number includes the following:
- Average labor costs per hour in North Little Rock which are typical of cabinet installation projects.
- Materials and equipment costs necessary to install cabinets in North Little Rock, AR, as well as any applicable delivery charges.
- Any applicable project preparation (necessary components, machinery and surface preparation) and cleanup fees.
- North Little Rock permits required for cabinet installation projects, which may also include inspection and building fees. Please contact North Little Rock city government to inquire which permits may be necessary.
- Supply and material city sales taxes in North Little Rock, 72114 area.
- Supply and material county and state sales taxes in Pulaski county, Arkansas.
- North Little Rock general contractor fees, if used for the project. Such fees usually add another 15% to the total. Using a general contractor is generally not required for North Little Rock cabinet installation projects.
Cabinet Installation North Little Rock Projects - Cost Breakdown:
- $63.97 to $111.70 - typical hourly labor costs seen for cabinet installation North Little Rock projects in 2014.
- $23.00 to $28.75 - typical costs associated with North Little Rock cabinet installation projects in 2014. This figure may include finishing materials, fasteners, connectors and surface preparation, as required.
- $57.79 to $76.76 - electric jigsaw, 3 1/4" electric planer, pneumatic finish nailer, 10" miter saw and 3" belt sander costs, as well as any other necessary equipment and machinery.